Project name | Shop of building materials |
Industry classification | Consumer sphere |
Basic information about the project |
---|
Project essence | The shop will offer to realisation wide assortment sanitary technicians and finishing materials. Platform for sorting and time storage of finished goods - 100 ì2 |
Project capacity | 3998 m2 |
Consumer market description | The basic groups of consumers: local residents, inhabitants of nearby cities |
Object construction term | 1 year |
Competitive advantage | Favourable site of the object. |
Resource availability for project realization | None |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 0,1296 |
Planned volume of gas consumption (annual), million cubic meters | 0,0035 |
Planned volume of water consumption (annual), million cubic meters | 0,00108 |
Degree of project development | feasibility study (account year – 2016) |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 51.01 |
Own resources, million rubles | |
Means of regional (municipal) budget, million rubles | |
Previously involved means, million rubles | |
Investment capacity, mln rubles | 51.01 |
Conditions of investor participation | Direct investments |
Form of investments return | Monetary |
Payback period | 3.50 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 3.99 |
Simple payback time | 3.50 |
Discounted payback period | 5.75 |
Internal rate of return (IRR) | 30.90 |
Productivity index (PI) | 1.00 |
Income per year | 56.55 |
Social efficiency of investment project |
---|
Number of workplaces | 22 |
Salary average level (thousand rub per year) | 228.00 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 10.26 |
which includes into consolidated budget of the krai, million rubles | 3.98 |
General information about the ground area |
---|
Address of the area | The land plot is located at Gelendzhikskaya Street in Kabardinka village in Gelendzhik |
Cadastre account of ground area | Registered |
Cadastre number of area/of quarter | 23:40:0202031:3 |
Declared area (m2) | 3998.00 |
Limit size of the area (m2) | 3998.00 |
Land category | Lands of inhabited localities |
Kind of allowed use | Business building |
Actual use | Not used |
Availability of buildings, structures, constructions | No real estate objects on the territory |
Permits, town-planning documentation | The General plan of municipal formation the city-resort of Gelendzhik – city district, approved by decision of Duma of the municipal formation the city-resort of Gelendzhik from 2 Nov 2016 ¹498 |
Information about proprietor (right holder) |
---|
Proprietor | municipal property |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | None |
Electricity supply |
---|
Power supply center (name, right-holder) | JSC «NESK-Elektroseti» |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | |
Power supply center (distance(m)) | 130.00 |
Nearest connection point (network tension, kV) | 15.00 |
Nearest connection point (distance(m)) | 130.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | JSC «Gelendghikgorgaz» |
Gas pipeline (diameter(mm)) | |
Gas pipeline (pressure(MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) | |
Gas pipeline (distance(m)) | 300.00 |
Nearest connection point (diameter(mm)) | 300.00 |
Nearest connection point (pressure (MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) | |
Nearest connection point (distance(m)) | 300 |
Water-supply |
---|
Water supply source (name, right-holder) | MUP «VKH» resort-city Gelendzhik |
Water supply source (power (cubic meters a day)) | |
Water supply source (quality of water) | Drinking water |
Water supply source (distance(m)) | 130.00 |
Nearest connection point (power (cubic meters a day)) | 3.00 |
Nearest connection point (diameter(mm)) | 150.00 |
Nearest connection point (distance(m)) | 130 |
Sewage system |
---|
Type of building (name, right-holder) | MUP «VKH» resort-city Gelendzhik |
Type of building (power (cubic meters a day)) | |
Type of building (distance(m)) | 25.00 |
Nearest point of connection (power (cubic meters a day)) | 3.00 |
Nearest point of connection (diameter(mm)) | 200.00 |
Nearest point of connection (distance(m)) | 25 |
Installation of telephones/internet |
---|
Central network (distance(m)) | 1200 |
Mobile communication (distance(m)) | |
Rated price of the ground area supplying with engineering, mln.rub | 5.985 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | Central Square, Revolutionary Street,1 | 20 |
nearest settlement | Gelendzhik | |
Center of federal subject | Krasnodar | 170 |
highways (regional, federal value) | M-4 Don | 1 |
highways of local value | Gelendzhikskaya Street | 0,03 |
nearest railway station | Novorossiysk | 13 |
nearest railway | Novorossiysk | 13 |
airport | Gelendzhik | 12 |
seaport | Novorossiysk | 13 |
Additional information about the ground area |
---|
Special conditions | Engineering prospecting were not conducted, there is descriptive geology. Seismic – 8 balls. Lay of land is foothill. Surface slope to the sea. Trees are absent. Wind direction – northeastern and southwestern. |
Cost of rent/buy of the ground area, mln. rub | 0.18 |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 44.64487500 |
Longitude (E) | 37.94959400 |
Notes | no |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Administration of the municipal formation Gelendzhik resort city |
Postal address | 353460, Gelendzhik, 1 Revolutionary Street |
Site | www.gelendzhik.org |
Phone/fax | +7(86141)3-16-48, 3-26-62 |
E-mail address | gelendzhik@mo.krasnodar.ru |
Executive (Full name, work position, phone number) | Belova Tatiana Vladimirovna - head of the Department of support of investment projects Department of architecture and urban planning, phone/Fax: 8(86141)3-16-48, 3-26-62, e-mail address: uag_gel@mail.ru |